Projects

We offer two types of EPC Solutions after evaluating factors like the Functionality, Usability & Viability:

Grid – Tied / On – Grid System

A Grid – Tied / On - Grid Photovoltaic Power System is an electricity generating solar PV power system that is connected to the utility grid. Such a system consists of Array of Solar Panels, One or several Inverters, Power Conditioning Unit and Grid Connection Equipment. This system incorporates the Net Meter facility which is a billing mechanism that credits the end user for any excess solar power generated and added to the grid.

Off – Grid System

An Off - Grid Photovoltaic Power System is an electricity generating solar PV power system that is not connected to the utility grid. The generated energy is stored in Battery packs for future utilization. Such a system is decentralized hence costly and requires some maintenance effort.

Residential Bungalow, Nashik

8 KW

Capacity

800 Sq.Ft.

Area

100 %

Savings

40 Months

Break Even

Petrol Pump, NH3 Igatpuri

7 KW

Capacity

700 Sq.Ft.

Area

50 %

Savings

33 Months

Break Even

Commercial Unit, Mumbai

35 KW

Capacity

3500 Sq.Ft.

Area

69 %

Savings

38 Months

Break Even

Heavy Vehicle Workshop, Panvel

12 KW

Capacity

1200 Sq.Ft.

Area

100 %

Savings

33 Months

Break Even

Printing Press, Navi Mumbai

55 KW

Capacity

5500 Sq.Ft.

Area

33 %

Savings

43 Months

Break Even

Public School, Nashik

21 KW

Capacity

2100 Sq.Ft.

Area

32 %

Savings

40 Months

Break Even

Salt Factory, Madurai

100 KW

Capacity

6000 Sq.Ft.

Area

100 %

Savings

55 Months

Break Even

Parking Structure, Madurai

30 KW

Capacity

2750 Sq.Ft.

Area

100 %

Savings

48 Months

Break Even

Residential House, Madurai

4 KW

Capacity

300 Sq.Ft.

Area

75 %

Savings

48 Months

Break Even

Chemical Factory, Thirunelveli

500 KW

Capacity

40,000 Sq.Ft.

Area

100 %

Savings

55 Months

Break Even

Petrol & Gas Pump, Sinnar

30 KW

Capacity

2500 Sq.Ft.

Area

100 %

Savings

40 Months

Break Even

Food Processing Unit, Nagpur

750 KW

Capacity

65000 Sq.Ft.

Area

75 %

Savings

42 Months

Break Even